SA · Tatiara Council
Pine Hill, 5269
Current weather
9.1°CLight drizzle
89% humidity · 23.3 km/h wind · 12.3° / 7.7° today · 11.3 mm rain
Updated
- Green suburb
Suburb profile
Pine Hill is a residential smaller community in Tatiara with a familiar suburban feel. Distance from the capital is noticeable, but the trade-off is space, calm and a community that knows its neighbours. Families and commuters make up much of the community, with plenty of residents in steady employment.
The town centre holds its own, with enough local flavour to make staying close to home appealing. There is a settled, neighbourly feel to the area that rewards people who like knowing their patch.
Homes are relatively affordable, which helps families and first-time residents put down roots.
Amenities
No OpenStreetMap amenities mapped for this suburb yet.
Contributes to desirability score · Lifestyle (15%)
Food, shopping, recreation and sport (OpenStreetMap)
Data sources & freshness
- Local amenity insights — Suburb Guide (derived from OpenStreetMap & Census) · Period: current · Updated on site · Derived from source metrics
- OpenStreetMap amenities — OpenStreetMap contributors · Period: current · Updated on site · Weekly refresh
Crime & safety
- Total offences (2023–24)
- 1
- Against the person
- 0
- Against property
- 1
- Rate per 1,000 residents
- 15.2
- State safety percentile
- 16.7th (lower crime is better)
Most common offence types
- Sct - Residence1
Contributes to desirability score · Safety (18%)
Crime rate and year-on-year trend
Data sources & freshness
- SAPOL reported crime statistics — South Australia Police — OpenData · Period: 2023-24 · Updated on site · Financial-year releases
Population
- Population
- 66
- Median age
- 34
- Median household income / week
- $1,937
- Dwelling vacancy
- 31%
- Unoccupied private dwellings
- 9 of 29
- Median monthly mortgage
- $650
- Employment rate
- 84.5%
- Dwelling mix (houses / semi / flats)
- 0 / 0 / 0
Contributes to desirability score · Community (5%)
Employment, household income and age diversity (2021 Census)
Data sources & freshness
- 2021 Census — General Community Profile — Australian Bureau of Statistics · Period: 2021 · Updated on site · 2021 Census release
The 2026 Census runs in August 2026; suburb-level updates are expected from mid-2027.
Socio-economic (SEIFA)
- IRSAD decile (2021)
- 2/10
- IRSD decile (2021)
- 2/10
SEIFA indexes from ABS 2021. Decile 10 = most advantaged / least disadvantaged in Australia.
Contributes to desirability score · Community (5%)
Socio-economic advantage (IRSAD decile)
Data sources & freshness
- SEIFA 2021 (IRSAD / IRSD) — Australian Bureau of Statistics · Period: 2021 · Updated on site · 2021 SEIFA release
Planning & development
Development applications from PlanSA register (lodged 2020–2026) and EPA licensed activities.
9 planning-related records
2025· 2 proposals
September 2025
- Construction of an agricultural building - hay shed144 DUNALBYN DR PINE HILL SA 5269Decision Made
July 2025
- Domestic Outbuilding (Shed).1009 PRESCOTT RD PINE HILL SA 5269Decision Made
2024· 1 proposal
March 2024
- Boundary Realignment (2 into 2)LOT 2 PINE HILL RD PINE HILL SA 5269;LOT 3 PINE HILL RD PINE HILL SA 5269Decision Made
2023· 2 proposals
April 2023
- Install Machinery Shed 40 x 21 x 6m Shed is all clad in zinc. Location will be parallel to existing shed, 12m in-between. Approx 43m to the fronting boundary line and more than 100m to the closest side boundary. Water will be caught and diverted to current tanks.476 LANGLEY RD PINE HILL SA 5269Decision Made
- Install of a machinery shed. 40 x 21 x 6M Shed will be approximately 105m to the front boundary, 34m to the nearest shed and 40m to the dwelling. All clad in zinc. Water will be caught and directed to water tank.235 LANGLEY RD PINE HILL SA 5269Decision Made
2022· 3 proposals
November 2022
- Machinery Shed to be installed 35m L x 21m W x 6m H Enclosed on 3 sides with sliding doors to the front. Shed to be clad in zinc. Rainwater to be collected and diverted to tank (yet to be installed) Shed is approx 200m+ to the front boundary and more than that to each other boundary in any direction. Will be approx 6-7m to nearest shed.87 DUNALBYN DR PINE HILL SA 5269Decision Made
May 2022
- Farm Shed1303 PRESCOTT RD PINE HILL SA 5269Decision Made
February 2022
- Rural shed17689 DUKES HWY PINE HILL SA 5269Decision Made
2020· 1 proposal
August 2020
- Machinery Shed1009 PRESCOTT RD PINE HILL SA 5269Decision Made
Contributes to desirability score · Future Growth (7%)
Development and planning activity
Data sources & freshness
- PlanSA development applications & EPA licences — Government of South Australia — PlanSA · Period: 2020–2026 · Updated on site
Hazards
- Bushfire planning zone
- Overlay applies
Bushfire overlay checked at suburb centroid against all current SA Planning risk layers (high, medium, general, urban interface, regional, outback). Safer places from CFS designated locations.
Contributes to desirability score · Safety (18%)
Bushfire hazard overlays
Data sources & freshness
- Bushfire & hazard overlays (SA) — Government of South Australia · Period: current · Updated on site
Recent changes
- Sct - Residencecrime1
- Boundary Realignment (2 into 2)planningLOT 2 PINE HILL RD PINE HILL SA 5269;LOT 3 PINE HILL RD PINE HILL SA 5269Lodged 04 Mar 2024 · Decision Made
- Construction of an agricultural building - hay shedplanning144 DUNALBYN DR PINE HILL SA 5269Lodged 24 Sep 2025 · Decision Made
- Domestic Outbuilding (Shed).planning1009 PRESCOTT RD PINE HILL SA 5269Lodged 18 Jul 2025 · Decision Made
- Farm Shedplanning1303 PRESCOTT RD PINE HILL SA 5269Lodged 17 May 2022 · Decision Made
- Install Machinery Shed 40 x 21 x 6m Shed is all clad in zinc. Location will be parallel to existing shed, 12m in-between. Approx 43m to the fronting boundary line and more than 100m to the closest side boundary. Water will be caught and diverted to current tanks.planning476 LANGLEY RD PINE HILL SA 5269Lodged 25 Apr 2023 · Decision Made
- Install of a machinery shed. 40 x 21 x 6M Shed will be approximately 105m to the front boundary, 34m to the nearest shed and 40m to the dwelling. All clad in zinc. Water will be caught and directed to water tank.planning235 LANGLEY RD PINE HILL SA 5269Lodged 25 Apr 2023 · Decision Made
- Machinery Shedplanning1009 PRESCOTT RD PINE HILL SA 5269Lodged 17 Aug 2020 · Decision Made
- Machinery Shed to be installed 35m L x 21m W x 6m H Enclosed on 3 sides with sliding doors to the front. Shed to be clad in zinc. Rainwater to be collected and diverted to tank (yet to be installed) Shed is approx 200m+ to the front boundary and more than that to each other boundary in any direction. Will be approx 6-7m to nearest shed.planning87 DUNALBYN DR PINE HILL SA 5269Lodged 10 Nov 2022 · Decision Made
- Rural shedplanning17689 DUKES HWY PINE HILL SA 5269Lodged 15 Feb 2022 · Decision Made
Data sources & freshness
- PlanSA development applications & EPA licences — Government of South Australia — PlanSA · Updated on site
- SAPOL reported crime statistics — South Australia Police — OpenData · Updated on site · Financial-year releases
More in Tatiara Council
Other suburbs in the same local government area.